Ostwald nitric acid plant: bottoms-up capex

Weak nitric acid, bleached ("water white"), with NH3 fed directly from the Haber-Bosch loop. Equipment-factored estimate. Base basis: US Gulf Coast, 2026 USD. Prepared by Waterwheel Materials, November 2026.

Total installed capex
Capex per annual tonne
100% HNO3 basis
Net steam export
Electricity import

Capex build-up

From installed equipment to total installed capex. OSBL, engineering and contingency are not applied to the precious-metal charge.

Breakdown by plant section

Click a section to see its components and how each was sized.

All cases compared

Total installed capex per annual tonne. The selected case is highlighted.

Steam & machine train

Show every component for this case

Method & caveats